COLTURADemo · fictional roofing company

Kestrel.Roofing0161 000 0000

Storm damage or water coming in today?Somebody answers 7am–7pm, seven days

Stockport & South Manchester

Roofs thatoutlastthe guarantee.

Kestrel Roofing has been re-roofing South Manchester since 2004. Fixed written prices, scaffold in the number, and a 25-year guarantee on every full roof we lay.

Call 0161 000 0000Get a fixed quote

Demonstration page — the number is not a working line.

A finished slate roof with lead flashing and a stone chimney
21
years roofing
25 yr
guarantee
£0
for the quote
48 hr
emergency response

Six things, done properly

What we do

Pitched roofs

25-year cover

Slate, clay and concrete tile. Full strip and re-roof, or a repair where a repair will genuinely last rather than buy us both six months.

Flat roofs

20-year cover

Single-ply and GRP on extensions, dormers and garages. No felt, no torch-on, no blowtorch anywhere near your rafters.

Leadwork

Code 4 & 5

Valleys, flashings, chimney trays and bay tops, cut and dressed on site by hand. This is where your water is coming in.

Guttering & fascias

Same week

Full replacement in UPVC or seamless aluminium, plus one-off clears and repairs that do not need a scaffold.

Chimneys

Fixed quote

Repointing, rebuilds, removals, trays and cowls. If the scaffold is up for the roof, this is the cheapest it will ever be.

Emergency repairs

24 hours

Storm damage made watertight, usually the same day. Dated photographs and a written report for your insurer at no charge.

Before you ring anybody

What a roof costs.

Three taps and you have a number. It is a range rather than a quote, because nobody can price a roof they have not stood on — but it is an honest range, it includes the scaffold and the skip, and it is a great deal more use than “prices on application”.

1What sort of roof

2What sort of house

3Scaffold

What that price already has in it

  • Breathable membrane, treated battens, stainless fixings
  • Ridge and hips re-bedded dry-fix, not sand and cement
  • Skip, disposal, and a magnet run over the drive
  • 25-year written guarantee on the covering

Indicative price

£8,950£12,550

A pitched job on a semi in Stockport. Roughly 4–6 days on site, plus a day either end for the scaffold.

Roof work, materials, skip
£7,800£11,400
Scaffold
£1,150
Survey and written quote
Free
VAT
Included

An estimate, not a quote. Roofs hide things, and the only way to know what is under yours is to get on it. The survey costs nothing, and the written price that follows it does not move.

Ring 0161 000 0000

Say “semi, pitched” down the phone and we will know exactly what you mean.

This summer

Six jobs, and what they cost.

Ordinary work on ordinary houses. Bands rather than exact figures, because your roof is not one of these — it is only near it.

  • Full re-roof, 1930s semi

    Bramhall · May · 5 days

    Original clay tiles lifted, sorted and re-laid on new membrane and treated battens. Forty-odd cracked ones replaced with salvage that matched. Chimney repointed while the scaffold was there, because it will never be cheaper.

    £9,000–£10,500

  • Flat roof, kitchen extension

    Heaton Moor · June · 2 days

    Bubbled torch-on felt off, single-ply membrane on, new outlet and drip trims. The standing water turned out to be a fall problem rather than a leak, so the deck got firrings before anything else went down.

    £3,000–£3,600

  • Storm damage, six ridge tiles

    Marple · March · Same day

    Rang at half two, made safe by five, re-bedded properly the following week once the wind had dropped. Photographs and a written description went to the insurer the same evening.

    £300–£450

  • Lead valley renewal

    Cheadle · April · 2 days

    Cracked Code 4 valley out, Code 5 in, new timber tilt fillets underneath. The stain was over the landing; the actual hole was four feet up the roof from it, which is normal and why we get on the roof.

    £1,000–£1,400

  • Chimney rebuild and flashing

    Romiley · July · 3 days

    Top five courses taken down and rebuilt in salvaged brick, new tray, lead cover flashing dressed on site. Pot re-seated and a cowl fitted to stop the downdraught the owner had been blaming on the fire.

    £2,400–£2,900

  • Guttering and fascias, full run

    Poynton · August · 1 day

    Seamless aluminium gutter, UPVC fascia and soffit front and back. The timber behind was sound once we had a look, so it stayed and the price came down by four hundred pounds from the quote.

    £1,600–£1,950

Hand-dressed lead flashing stepped into brickwork above a slate roof

Leadwork

The bit that actually leaks.

Nine times in ten the water is not coming through the tiles. It is coming in where the roof meets something else — a chimney, a parapet, a valley, the back of a bay. That is lead, and lead is the part most firms sub out or settle with a tube of mastic.

Code 4 and Code 5, never flashband
Self-adhesive tape is a two-year fix sold as a repair. We have pulled a great deal of it off other people’s work.
Cut and dressed on site
Bossed by hand to the actual shape of your chimney, rather than folded flat in a yard and hoped over on the day.
Joints welted, not sealed
Lead moves about four millimetres a metre on a sunny day. Anything rigid holding it down will crack. Ours is not holding it down.

First call to final sweep

How the fortnight goes.

  1. 1

    Day nought

    You ring, a roofer answers

    Not a call centre and not a form. Three questions: what is it doing, when did it start, and can you see it from the ground. A fair number get solved on the phone for nothing, which costs us a job and wins us the next three.

  2. 2

    Within 48 hours

    We come out and get on it

    Ladder up, camera out, photographs of what is actually wrong rather than what we would like to sell you. You get those photographs whether you use us or not — they are yours, and they are useful to whoever you do use.

  3. 3

    Same week

    One sheet of A4

    Itemised, fixed, VAT shown, scaffold in it, and valid for ninety days so you have time to get two more quotes and compare them properly. If we are the expensive one, we would rather you knew why.

  4. 4

    When you say

    A date, and the weather it depends on

    You get a start date and the window we are working to. If the forecast turns and we have to move you, you hear it the day before — not at half seven on the morning you booked the day off.

  5. 5

    Days one to six

    Sheeted every night

    Scaffold first. We never strip more roof in a day than we can cover by four o’clock, whatever the sky says at lunchtime. One photograph a day to your phone, because you cannot see the work and it is your house.

  6. 6

    Last afternoon

    Magnet over the drive

    Scaffold down, skip gone, and a magnet run over the drive and the lawn for nails before we ask you to walk round it with us. Guarantee posted out within the week, on paper, with the job written on it.

No small print

In writing.

Four commitments and the six questions everybody asks on the doorstep. Nothing here is hidden behind a plus sign, because a page that makes you click to find out about deposits has told you something already.

01
Fixed price, in writing
The number on the quote is the number on the invoice. Anything extra gets agreed before a tool moves, or it does not happen at all.
02
Scaffold in the price
Not a line added on later once you are committed. If the job needs a tower or a full run, it is already costed and it is on the sheet.
03
We clear up
Skip, magnet sweep for nails, and the drive left as we found it. Every time, as standard, rather than when somebody asks.
04
One number, one roofer
Whoever quotes the job runs the job. You are never handed to an office that has never seen your roof and cannot picture it.

Asked on the doorstep

How long does a re-roof actually take?
A three-bed semi is four to six working days, plus a day either end for the scaffold. A terrace is quicker; a detached with hips and dormers is slower. Rain adds days, and we will tell you which ones it added rather than quietly extending the end date.
Do I need scaffolding, or can you do it off a ladder?
If a roof is coming off, you need scaffold, and anyone offering to strip it from a ladder is telling you something useful about how the rest of the job will go. Gutter clears, a slipped slate and most leadwork repairs are genuinely ladder or tower work — and we do not charge you for a full run you do not need.
Will my insurance cover storm damage?
Often, if the wind was genuinely strong enough and the roof was in reasonable order beforehand. What insurers want is dated photographs and a written report describing the damage rather than the repair, so that is what we send, free, on the day. We will also tell you honestly when we think a claim is not worth your excess.
What happens if it rains halfway through?
The roof is sheeted and battened down every night, and we never open up more than we can close by four. If a week turns genuinely bad we stop, make it watertight and come back — you are not left under a tarpaulin with an apology and a half-finished ridge.
Do you take a deposit?
Not on domestic work under ten thousand pounds. Materials go on our account, and you pay when the scaffold is down and you have walked round the job with us. Special-order tiles are the one exception, and if that is your job it is written on the quote with the reason next to it.
What if you find something under the tiles?
Perished battens and a few rotten boards are expected and already in the price. A cracked purlin is not — so we stop, photograph it, and ring you with a number before anyone carries on. Nothing lands on the invoice that you have not agreed to out loud first.
Do I need to be in while you work?
No. We need an outside tap and somewhere legal to stand the skip, and after that you can go to work. Most customers see us properly on the first morning and the last afternoon.

Where we work

StockportBramhallCheadleMarplePoyntonHazel GroveWilmslowDidsburyRomileyDisleyGatleyHeaton Moor

Just outside it? Ring anyway. Kestrel Roofing is not precious about a postcode boundary.

Got a leak? Ring us.

We answer between 7am and 7pm, seven days. If it is an emergency we will tell you honestly whether it needs us today or whether it can wait until the weather turns.

0161 000 0000Unit 4, Brinksway Trade Park, Stockport SK3 0BR

A demonstration design, not a real company. The address, phone number, prices, jobs, guarantee and trading history are invented, and no certification, insurance or trade-body membership is being claimed. The name is whatever you last typed into “Make it yours”.